138 kV Double-Circuit Transmission Line Rebuild (11 Miles)

Client: Transmission Line Rebuild

138 kV Monopoles Red/Green Tag Construction Sequencing Fiber FAA

Project Overview

Led complete engineering design for an 11-mile 138 kV double-circuit transmission line rebuild replacing century-old lattice towers with new steel monopole structures. Key challenges included:

- Red-tag/green-tag construction sequencing with live-line adjacency
- Maintaining customer taps in service throughout construction
- Coordination with contractor outage sequencing plans
- Structure spotting, easement coordination, and soil boring programs
- Fiber design, FAA permits, and state agency coordination
- Detailed construction sequencing to manage radial feed constraints

The project required close coordination between engineering, construction, and utility operations to ensure continuous service during the multi-phase rebuild.