345 kV Gen-Tie Design for Utility-Scale Solar
Client: Renewable Energy Interconnection
Project Overview
Served as lead transmission engineer for a 345 kV overhead gen-tie connecting a solar generation facility to the utility point of interconnection. Delivered a complete IFC construction package including:
- PLS-CADD line modeling with survey and grading integration
- Plan and profile drawings, structure framing and assemblies
- Self-supporting steel monopole design on drilled shaft foundations
- OPGW fiber routing, splice locations, and coordination
- Conductor selection with ampacity and surface gradient calculations
- Stringing charts, bills of material, and construction staking
- FAA pre-screening evaluations
- Crossing and interconnection documentation for permitting
Design performed in accordance with NESC 2023 and applicable utility standards, coordinating with EPC teams and geotechnical consultants throughout the project.
Like what you see?
Let's build something amazing together. Get in touch to discuss your project.