Project Overview

Provided early-stage power delivery engineering for numerous utility-scale renewable energy projects across multiple states. Deliverables included:

- Design criteria documents for each project
- LiDAR data acquisition from open sources and project-specific surveys
- PLS-CADD conceptual modeling and preliminary structure spotting
- Routing assessment reports with multiple route option evaluation
- Ampacity and surface gradient calculations for conductor selection
- EMF study reports
- Crossing constraint identification (pipelines, railways, utilities, roadways)
- Permit-level plan and profile drawings and KMZ exhibits
- Water crossing drawings for USACE permit applications
- Environmental and land-use constraint integration

Voltage classes ranged from 25 kV to 345 kV, supporting solar, BESS, and wind generation interconnection projects from conceptual stage through permitting.